Quote:
Originally Posted by Dean
No, in most cases a hose, a peice of 3/4" PVC a couple PVC ends designed for it on the ends and 30 minutes is all that is needed to tunnel under a sidewalk as long as the ground was prepped right before they poured, and there aren't any large rocks.
I've seen them used to go under entire driveways...

|
My dad used to work for these guys: http://www.utimachines.com/
Get a hydra-punch.
(and yes, worst website evar.)
__________________
Is you is, or is you ain't, my con-stit-u-ints?
|