Well, I have bought all of stage one, and all of stage two.
Here is the tranny cooler I picked up today. Now basically I have to wait to get the water temp gauage in the mail along with the lo-tek pillar pod. Then it all gets installed, then on to the T/C itself which will be about a 1,200$ job if not more.
__________________
Captain Murphy: I dub thee Sir Phobos, Knight of Mars, beater of ass. Be a hitter, babe.
|